
Designed for real learning.
Aligned to the New Zealand secondary mathematics curriculum
Structured practice that builds understanding and confidence
Flexible learning in print, on screen, or both
IAS 3.4 Critical Path Analysis eFlip Book
ISBN 978 1 927164 23 5 eB
The Year 13 Mathematics IAS 3.4 eFlip book is designed for use by Year 13 students studying the internal achievement standard Critical Path Analysis for NCEA Level 3 Mathematics. The IAS 3.4 eFlip book comprises full notes and worked examples for each concept within the standard with space for key points to be highlighted. Each concept is followed by a number of problems, which are identified as either Achievement, Merit or Excellence. At the end of the eFlip book there is an original practice Internal Achievement Standard. The answers at the back of the book often include some of the setting out required to solve the problems so students can see the correct approach. This eFlip book is compatible on all Desktop computers, Laptops and Chromebooks as well as all mobile devices. It includes links and the ability to add annotations, bookmarks etc. 72 pages. Once purchased you have Instant access to this digital eFlip Book.
